Pertamina Maintenance & Constructrio Using Crane Barge DUPA 08
Before being used for DUPA08 work, an inspection by MWS from ABL is required. This is to ensure safety when working in oil and gas.
Austine Maritime Project
Austin Maritime Use our services to fulfill the repair of oil drilling vessels to dock at the port.
Pertamina Maintenance & Construction SPM 3600 DWT
The work of replacing the SBM 3600 DWT pipe was carried out by PERTAMINA M&C using a dupa 08 cranebarge.
IKPT Instalitation Concrete Block
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis.
Need Help with Easier Industrial Solutions? We Are Experts!